Free
Crusher, a free CamelCrusher alternative
The CamelCrusher sound, freshly
squeezed.
I measured CamelCrusher and rebuilt it from scratch. It sounds the same, and now it can crush in three bands.


- 0.1 dB
- from CamelCrusher’s loudness, on the same drums, bass and vocals
- 1%
- from its Tube and Mech curves, of full scale
- 0
- samples of latency at 1x
- Same
- CPU as CamelCrusher at default settings
Distortion
Tube and Mech, just like the original.
Both distortion modes, rebuilt to within 1% of CamelCrusher’s curves. Tube is smoother, Mech is harsher, and you can use both at once.

Compress
The compressor, with Phat.
Compress pulls the quiet parts up toward the loud parts, so everything comes out dense. Phat works the same as CamelCrusher’s, and if you turn it off you get a clean compressor.

Filter
A low pass before the distortion.
The resonance gets crushed along with everything else, up to +17 dB. It’s off when the knob is all the way up, same as the original.

Bands
Three bands, if you want them.
CamelCrusher runs the whole mix through one curve, so the kick and the hats get mashed together. Turn on Bands and the lows, mids and highs each get crushed by their own amount.

Out
Oversampling, if you want it.
At 1x it aliases exactly like CamelCrusher, because that grit is part of the sound. At 4x the aliasing goes away and you get 75 samples of latency.

System requirements
Mac
macOS 11 or later
Apple silicon and Intel
Windows
Windows 10, 11 (64-bit)
Formats
VST3, AU, CLAP (64-bit)
Hosts
I’ve tested it in:
- Ableton Live 12
- Apple Logic Pro
- FL Studio 20 or later
- REAPER
- Tracktion Waveform 14
It’ll probably work fine in:
- Ableton Live 10 or later
- Bitwig Studio 4 or later
- Steinberg Cubase 10 or later
- PreSonus Studio One 5 or later
- Reason 13 or later
- Any other DAW that loads VST3, AU or CLAP
It won’t load in Pro Tools, which only takes AAX.
If it gives you trouble in your DAW, email support@nonsense.audio and I’ll consider taking a look.
Frequently asked questions
Crusher
Is Crusher the same as CamelCrusher?
Crusher is a new plugin built by measuring how CamelCrusher responds, so its distortion and compression sound very close to the original (maybe even better?). The three-band mode, per-band compression and oversampling are modern additions to the original.
Does Crusher add latency?
Crusher runs with zero latency by default. Turning on 4x oversampling adds 75 samples, and Crusher reports that to your DAW so your tracks stay aligned.
How much CPU does Crusher use?
At default settings it uses the same CPU as the original CamelCrusher. Switching on the three bands needs a bit more, and 4x oversampling more again.
Why is it lemonade themed?
Why not?
Installation
Is Crusher free?
Crusher is completely free, because I don’t want to deal with licenses or payment.
Do I need an internet connection?
No internet connection is needed to install or use Crusher.
Does Crusher run natively on Apple silicon?
Crusher runs natively on both Apple silicon and Intel Macs.
What if I need 32-bit?
Too bad.
One email when each one’s out. Nothing else.